Description: eXtreme Management Tool
        =======================
        
        This application provides project administration which supports the
        eXtreme Programming Methodology.
        
        Content Types
        -------------
        
        * Project
        Multiple projects can be added by employees. For each project,
        iterations and stories can be added by both the customers and employees.
        
        * Iteration
        The project will be planned with iterations. An iteration is a
        period of 1 to 3 weeks in which a number of stories will be
        implemented.
        
        * Offer
        Contains the stories that a customer wants in this Project. It
        is used as a way to bundle the wishes of the client and give a
        first indication of the size of a project.
        
        * Story
        The customer can define new features by describing these feature
        in a story.
        
        * Task
        The employees can estimate the story by defining tasks.
        
        * Booking
        While working on tasks the employees can track time and easily book
        those at the end of the day.
        
        
        Workflow
        --------
        
        Customers can create stories and submit them for estimating. The employees
        will find pending stories in the review portlet and provide a rough estimate
        and change the state by using the 'mark estimated' transition.
        
        The customers are able to prioritize the stories based on value for the
        organisation and the rough estimate. When the team has committed to the number
        of stories, they can start writing tasks and provide estimates for each task.
        
        After all tasks have been written and estimated the iteration can be
        started by following the transition 'start working'. This will set the status
        of all tasks to 'todo', so employees will see their tasks in the todo list.
        
        Activating tasks will send notification email to the assignees. When
        an iteration is activated, this could result in quite some mails to be
        sent. To prevent this from slowing down the activation of the
        iteration, one could consider adding MaildropHost in the instance.
        
        When completing all tasks in a story the story itself will be set to
        'completed'.
        
        
        Time Tracker
        ------------
        
        The time tracker allows the employees to track their work in real time. You
        can select a few tasks to work on from the list of assigned tasks. The tracker
        will display an input field for each task. Instead of using the punch-in,
        punch-out system we choose to start working by just starting the timer. After
        you have finished a task you describe your work in the input field and hit the
        'track' button
        
        The time spent on the task will be registered with your description and the
        timer will reset itself so you can start on the next task.
        
        In case you get interrupted by a phone call or a colleague asking for help,
        you simply provide a quick note on what you were doing in the task input.
        Again this will reset the timer. At the bottom of the tracker an input field
        for unassigned tasks is available, to track interruptions like these. If you
        register the time here, you can later hit the 'Add to task' button, which
        allows you to browse through all open tasks and book the time there.
        
        At the end of the day you can expand each task do any last changes to either
        the description or the time. In case you didn't finish the task yet you can
        click the 'book' button to add a booking to the task with the total time. When
        you did finish the task you can click 'book and close', this will change the
        state of the task to completed.
        
        
        Release Plan
        ------------
        
        The Release Plan provides the customer with an "Overall Plan". At the start of
        a project all stories are added to the project. Depending on the velocity of
        the development team and the size and number of stories the expected number of
        iterations can be added. The customer can than prioritize the user stories using
        drag and drop and assign them to iterations.
        
        
        Iteration Roundup
        -----------------
        
        When the iteration is finished, some stories might not be completed. Using the
        close iteration option from the 'action' dropdown allows you to select or
        create the next iteration and copy over all unfinished stories, including
        unfinished tasks.
        
        
        
        Installation
        ============
        
        Make a backup of your site.  You can never be too careful.
        
        We strongly advise using buildout; it is certainly not impossibly to
        get it to work in other ways but this is not supported.  Just add
        Products.eXtremeManagement in the main eggs section of your
        buildout.cfg.
        
        *Important*: you need to install egenix-mx-base from Egenix_.
        Either use the installers provided by them or use your own system
        tools (``apt-get install python-egenix-mxdatetime`` works on
        Debian/Ubuntu) or use ``easy_install egenix-mx-base``.  On Windows
        the installers seem to be the easiest way.
        
        Then restart your zope instance and use the Add/Remove products page
        in Site Setup to install eXtremeManagement.
        
        .. _Egenix: http://egenix.com/
        
        
        Dependencies
        ============
        
        For reference, here are the dependencies:
        
        * Plone: 3.1 or 3.2 with Zope 2.10.
        
        * Some xm.* and kss.* packages and pygooglechart (pulled in
        automatically via setup.py)
        
        * Poi with its dependencies.  Get a bundle with products fit for the
        Plone version you are using: http://plone.org/products/poi
        
        With Poi installed, eXtremeManagement allows you to add an issue
        tracker in a project.  And you can add PoiTasks to Stories, which
        lets you easily link to existing issues in the tracker of your
        project.
        
        * The mx.DateTime library from Egenix_; see the Installation_
        instructions above.
        
        
        Optional extra
        ==============
        
        If you have a project management website you should seriously
        consider installing the ``xm.theme`` package.  This gets rid of part
        of the default Plone UI so it fits a project management site more.
        Try this out locally before you use it in production.  Note that
        this may become a real dependency in newer versions of
        Products.eXtremeManagement
        
        
        Conflicting Products
        ====================
        
        * eXtremeManagement is known not to work with ZEPP/PlonePM, another
        project management product.  It uses a Task content type, just
        like eXtremeManagement does.  This causes problems.  If you want
        to try out both, do that in separate Zope instances.
        
        * Same is true for PloneBooking.
        
        
        Authors
        =======
        
        Jean-Paul Ladage <j.ladage@zestsoftware.nl>
        
        Maurits van Rees <m.van.rees@zestsoftware.nl>
        
        Mirella van Teulingen <m.van.teulingen@zestsoftware.nl>
        
        Jodok Batlogg <jodok.batlogg@lovelysystems.com>
        
        Harald Friessnegger <harald.friessnegger@lovelysystems.com>
        
        Daniel Nouri <daniel.nouri@gmail.com>
        
        Joris Slob <j.slob@zestsoftware.nl>
        
        Mark van Lent <m.vanlent@zestsoftware.nl>
        
        Hans-Peter Locher <hans-peter.locher@inquant.de>
        
        Stefan Eletzhofer <stefan.eletzhofer@inquant.de>
        
        Reinout van Rees <r.van.rees@zestsoftware.nl>
        
        
        History
        =======
        
        
        2.0.1 (2009-03-22)
        ------------------
        
        - Fixed http://plone.org/products/extreme-management-tool/issues/168
        In the planned iterations view you can now add new iterations [jladage]
        
        - Fixed http://plone.org/products/extreme-management-tool/issues/166 [jladage]
        
        - When viewing a task in a completed story would show you a login form. This
        was caused by removing the modify portal content permission for manager
        [jladage]
        
        - Fixed http://plone.org/products/extreme-management-tool/issues/167 [jladage]
        
        - Updated README.txt with the time tracker and iteration closing feature. [jladage]
        
        - Added setup.py with aliases to upload to pypi and plone.org [jladage]
        
        
        2.0 (2009-03-15)
        ----------------
        
        - Project managers can now close an iteration and automate copying over unfinished
        stories, including unfinished tasks. [jladage]
        
        - Updated Projects and Story workflows.  [maurits+jladage]
        
        - Fixed Typo in permission to guard editing the budget hours. [jladage]
        
        - Fixed bug in pending stories portlet. [maurits+jladage]
        
        - Added extra check in poi portlet to only show when there are open
        issues.  Fixes issue 154.  [maurits]
        
        - Actually use the description textarea from the submitted add task
        form.  [maurits]
        
        
        2.0rc2 (2009-01-26)
        -------------------
        
        - Only display transition warning icon when there are messages. [jladage]
        
        - Only display project portlet is there are any links to show. [jladage]
        
        - Minor changes to translations. [jladage]
        
        
        2.0rc1 (2009-01-25)
        -------------------
        
        - Fixed workflow messages in task view and add i18n. [jladage]
        
        - Added translations for the two templates in xm.booking [jladage]
        
        - Fixed issue 100, list of projects are loaded on DOM load. [reinout +
        mark]
        
        - Show images and files from the story in the offer view.  [maurits+fred]
        
        - Fixed another part of issue 131: by committing subtransactions more
        often, less ConflictErrors occur and their impact is less. This
        should speed things up at least a bit. [reinout + mark]
        
        - Moved the startStory and startIteration scripts zo they are
        triggered *before* the transition of the story/iteration. [reinout +
        mark]
        
        - Gave our custom roles (Customer, Employee, Projectmanager) some of
        the permissions defined by CMFEditions.  Case in point: on the Zest
        projects site we started using versioning for Stories, and a
        non-Manager/Owner could no longer edit a Story... [maurits]
        
        - Fixed issue 131 for changing the workflow state of a task in the
        story view. Other workflow changed still need attention; they may be
        the result of ConflictErrors. [reinout + mark]
        
        - Fixed issue 112, when reactivating a task in a completed story, the story is
        set to ' in-progress'. [jladage]
        
        - Fixed issue 111, customers can now only view issue of their own trackers.
        [jladage]
        
        - Fixed issue 113, customers and employees can now add files and images to the
        story. [jladage]
        
        - Fixed issue 138, the person doing the transition will not receive an e-mail
        notification. [jladage]
        
        - Fixed issue 120, Current Iterations table has now a column 'worked hours'
        and updated translations. [jladage]
        
        - Fixed issue 134, releaseplan now uses id attributes that start with story-*
        [jladage].
        
        - Fixed issue 136, the iteration portlet only displays links to current,
        planned and finished iterations if there is something to show. [jladage]
        
        - Fixed issue 139, the dropdown with related tasks in the poi portlet has now
        a fixed width. [jladage]
        
        - The listing of In-Progress iterations now has links for billable and
        unbillable iterations. [jladage]
        
        - Added listing of iterations that have been invoiced this month. [jladage]
        
        - In the releaseplan you can now drag and drop stories to/from the unplanned
        stories table. [jladage]
        
        
        2.0beta3 (2009-01-11)
        ---------------------
        
        - Fixed bug in the 'my projects' listing in the project portlet. [jladage]
        
        
        2.0beta2 (2009-01-09)
        ---------------------
        
        - Refactored the add_task KSS - it now collapses again. [simon]
        
        - Added totals to the finished iterations view and (total) estimate to
        the planned iterations view. [reinout + mark]
        
        - Removed My task listing from iteration view, to allow role based caching.
        [jladage]
        
        - Commenting has been disabled. [jladage]
        
        - Add task KSS is now also collapseable. [simon, fred]
        
        - Use plone_tools where possible, getting rid of getToolByName.
        
        
        
        2.0beta1 (2009-01-08)
        ---------------------
        
        - Fixed translations
        
        - The my project dropdown now displays all active projects for ProjectManagers.
        [jladage]
        
        - Removed personalized My todo list from iteration view. [jladage]
        
        - When no start or end date is provided, simply a dash is displayed. [jladage]
        
        - The release plan was guarded with Manage Portal permission, this is now
        set to the View permission. [jladage]
        
        - The 'add task' link is now only displayed when the user has the correct
        permission. [simon]
        
        - Removed the Project Administration templates and view. [jladage]
        
        - Removed the old update_hours_form, we now have the time tracker. [jladage]
        
        - Corrected the available method for the tasks portlet, so anonymous
        doesn't see it. [jladage]
        
        - Added site action 'Projects' to link to the project website, this way
        we are consistent with the time tracker site actions. [jladage]
        
        
        
        2.0alpha3 (2009-01-07)
        ----------------------
        
        - The Add task form at the story view is now loaded using kss. By default no
        assignee is selected.[jladage]
        
        - Updated the dutch translations.[jladage]
        
        - Added a link to a list of 'Planned iterations' to the iterations portlet.
        [jladage]
        
        - Cleaned up a number of templates that are not used anymore,
        project_administration, customer_view, etc. [jladage]
        
        - Current iteration link in the Iterations portlet now provides a correct URL.
        In addition if two iterations are in the state 'in-progress' a status message
        will guide you to the other iteration. [jladage]
        
        - Added view that lists finished (=invoiced or completed) iterations.
        [reinout]
        
        - Setuphandlers.py now zaps several known old-style portlets.  [reinout]
        
        - Replaced story estimation portlet by a new-style one.  [reinout]
        
        - Removed obsolete portlet_my_projects portlet.  [reinout]
        
        - Added better documentation to portlets.xml, unified names/titles of portlets
        in various places. [reinout]
        
        - Added new-style link-to-poi-issue portlet as replacement for part of the
        old-style poi portlet. [reinout]
        
        - Added new-style poi_creation portlet as replacement for part of the
        old-style poi portlet. [reinout]
        
        - Fixed possible DiscussionNotAllowed error when expanding a Story.
        [maurits]
        
        - Now refreshing story details box provider when quick-adding a Task.
        [maurits]
        
        - Changed story details box into a provider (viewlet manager without
        viewlets) so we can refresh that provider with KSS.  [maurits]
        
        - Moved "eXtremeManagement: View Tracker" permission from xm.tracker
        to Products.eXtremeManagement as we do not actually use that
        permission in the xm.tracker package but only in actions.xml of
        Products.eXtremeManagement.  This also means we do not have to have
        a dependency on xm.tracker (at least currently). [maurits]
        
        - Fixed issue #127 - "Add task" widget breaks if there aren't Employees
        http://plone.org/products/extreme-management-tool/issues/127
        [maurits]
        
        - Renamed reorder_stories to releaseplan [jladage].
        
        - The time tracker is now guarded by a special permission. As a result only
        users with the Projectmanager or Employee assigned globally will be able to
        use the timetracker. [jladage]
        
        - The invoicing view now only shows projects that are billable. This change
        requires that the getBillableProject index has to be reindexed manually [jladage]
        
        - Instead of sending an email to new assignees of a Task whenever that
        Task is edited, only send an email when the Task gets transitioned
        to the to-do state.  Also made the email sending more robust in the
        face of special characters, like Czech.  This refs:
        http://plone.org/products/extreme-management-tool/issues/92
        http://plone.org/products/extreme-management-tool/issues/118
        http://plone.org/products/extreme-management-tool/issues/124
        [maurits]
        
        - Enable optional experimental.catalogqueryplan usage. This needed a fix in
        some of the tests as experimental.catalogqueryplan caches daterange results
        in REQUEST. Add the egg to buildout's egg list to get a speed increase.
        [reinout]
        
        - Show the number of comments of a Story in the story details viewlet
        (when expanding the story in the iteration view).  Fixes
        http://plone.org/products/extreme-management-tool/issues/87
        [maurits]
        
        - Employees overview: show the strict percentages and totals for the
        week, meaning: count only the days in this month.  The totals and
        percentages that really count the whole week are now available as a
        tooltip.  This is pending refactoring into two views as Managers and
        Employees have a different wish list here.  [maurits]
        
        - Moved employees_overview page here from xm.theme.  [maurits]
        
        - Fix: Only add the billable hours of a day to the week/month when
        some work (billable or not) has been done on that day.  [maurits]
        
        - In the migration from ProjectFolders/CustomerFolders to normal
        Folders, set the immediately addable types too.  Note that Customer
        content type is not addable by default anymore, so in the migrated
        CustomerFolder you can only add a Customer when you allow Customers
        to be added globally.  [maurits]
        
        - Refactored KSS, CSS, JS and Python for workflow gadgets. Removed duplicated
        ids (#task-list-for-story) in favour of existing class (.tasklist_table),
        added KSS rebinding of workflow menus and stripped redundant CSS. [simon]
        
        - Added /inprogress view for managers that lists all in-progress iterations.
        [reinout]
        
        - Added /invoicing view for managers that lists all invoicable
        iterations. [reinout]
        
        - Removed almost all descriptions for Customer as they're useless ("enter
        address" description for an "address" field). Some of the descriptions were
        wrong anyway. Fixes
        http://plone.org/products/extreme-management-tool/issues/71 [reinout]
        
        - Added checks whether start/endDate are set as toLocalizedTime(None) returns
        today as value. So unset start/end dates looked like today. Fixes
        http://plone.org/products/extreme-management-tool/issues/81 [reinout]
        
        - Corrected my CSS/KSS bug in the story workflow state changer, re:
        http://plone.org/products/extreme-management-tool/issues/78 [simon]
        
        - Added more of our content types to the kupu collections and
        linkables.  Fixes
        http://plone.org/products/extreme-management-tool/issues/72
        [maurits]
        
        - Add an empty entry to the xm.add_task_form viewlet. Now one can
        quickly add tasks without having to assign anyone to it. [mark]
        
        
        2.0 alpha 2 (2008-09-17)
        ------------------------
        
        - Fixed UnicodeDecodeError in the state change viewlet.  [maurits]
        
        - Cloned and tweaked the CSS for our clone of the Plone authoring
        actionMenu.  [simon]
        
        
        2.0 alpha (2008-09-16)
        ----------------------
        
        - Added 'locked status' logic so the release planning view can display it.
        Cleaned up release planning view logic, icluding class generation.
        Corrected relevant tests.
        
        - Added CSS and exception-hardening to our previous work on reorderable
        stories - on failing to move a story we redirect to the story so it can be
        fixed. [reinout+simon]
        
        - Made the eXtremeManagement PTSTranslationDomain available as
        zope.i18n domain.  This makes portal status messages from kss
        translatable again.  [maurits]
        
        - Got the actual drag/drop to work. Needs more work though. [reinout]
        
        - Started the view for reordering stories. [reinout+simon]
        
        - Made the review state of tasks in the simple task list overview be
        a dropdown list with workflow transitioning via KSS, just like the
        default Plone review state.  [maurits+simon]
        
        - @Lazy optimizations in browser/tasks.py. [reinout]
        
        - Show link to xm time tracker in site actions when the xm.tracker
        package is available.  [maurits]
        
        - Include zcml of xm.tracker when the package is there.  [maurits]
        
        - Created @@xm_global_state view, with currently one method
        has_tracker which is True when the xm.tracker package is
        available.  [maurits]
        
        - Treating booking's description as webintelligenttext. [reinout]
        
        - Cleaned up redundancy in task_review template (issue #75).  [simon]
        
        - Merged fix from the time tracker branch (issue #75): Changed
        task_overview template and tasks.py to display localised workflow
        state labels.  [simon]
        
        - Merged fix from the time tracker branch: catch a divide by zero
        error.  [reinout]
        
        - Merged the testing changes from the zest-timetracker branch.
        [maurits]
        
        - Added Products.Poi to the install_requires in setup.py as Poi now
        has eggs for both branch 1.1 and trunk.  [maurits]
        
        - made the print view for offer look nicer. Added new dutch translation.
        [mirella]
        
        - Show attachments (Image, File, most importantly Story) in the
        project view, but only when xm.theme is not available, as that has
        a portlet and another view for this info.  (Merged from
        branches/1.6, r69421 and r69426.)
        
        - Added tests for style conditions, which lead me to a bug in the logic. In
        the booking_month view, in case someone worked less than 40 hours in a week
        that total will be highligted. [jladage]
        
        - Fix a Plone 3.0 support issue in the javascript registry.[jladage]
        
        - fixed name typo in css [mirella]
        
        - minor css changes to booking_month.pt, added translations and
        description for employees overview. Added odd color ad padding to
        employees overview, generated i18ndude and added the missing dutch
        translations and update_hours_form placed bookingsdate next to title.
        <th> has nowrap and left/right padding.[mirella]
        
        - Now loading the zcml from kss.plugin.yuidnd automatically, so that
        package does not need to be included in [instance]zcml of buildout.cfg
        anymore. [maurits]
        
        
        1.6.1 (2008-07-31)
        ------------------
        
        2008-07-30 - mirella
        
        - removed hours/minutes from iteration view of start and enddate
        of an iteration.
        
        2008-07-30 - jladage
        
        - bookings per month now doesn't highlight days with less than 8 hours.
        Instead it highlight if the hours per week is below 40 hours and if the
        billable percentage for a week is below 50%.
        
        2008-07-23 - markvl
        
        - Made the check for customers in the myprojects view more
        robust. Employees which also have a customer role are no longer
        seen as customers.
        
        2008-07-23 - mirella
        - added translations
        - show in iteration view the budget left in a row below the  total.
        - removed actual hours and budget left hours from the table above the stories.
        - fixed width of the table
        
        2008-07-17 - mirella
        - changed width of storylist table in 97% for fixing IE7 problem of overlap.
        
        2008-07-17 - jladage
        
        - Added migration for content types 'ProjectFolder' and 'CustomerFolder'
        back to regular folders.
        - Added a note about upgrading from older versions than 2.0.
        - Marked all code related to the following content types with BBB for easy
        cleanup in the next release.
        
        1.6 final (2008-07-16)
        ----------------------
        
        - Official Release, no changes since rc10
        
        
        1.6 rc10 (2008-07-09)
        ---------------------
        
        - Fixed name of permissions that had a rogue slash at the end.  Silly
        me.  [maurits]
        
        - Fixed typos that referred to a different spelling of the
        Projectmanager role.  [maurits]
        
        
        1.6 rc9 (2008-06-30)
        --------------------
        
        2008-06-26 - seletz
        
        - browser/xm_kss.py: Only update story viewlets in story context.
        - browser/viewlets/manager.py: delegate icon fetching to the view, and do it
        there such that it only returns the icon name.  That fixes the
        icon-of-iteration-is-not-found-if-site-is-named-plone bug.
        - browser/xm_kss.py: Only update viewlet for task bookings if we're actually
        in task context.  Otherwise we'll get a ComponentLookupError if the story
        gets activated (tasks get automatically transitioned from new->activated).
        
        
        1.6 rc8 (2008-06-26)
        --------------------
        
        2008-06-26 - seletz
        
        - skins/eXtremeManagement/story_view.pt: Render the task list even
        if empty; otherwise the KSS-ified task adding cannot refresh the
        task list.
        - browser/xm_kss.py: fix comparsion of WF event states to fix a
        ComponentLookupError if adding tasks using KSS in a story.
        - added mr_savage and myself to the AUTHORS.txt (no CONTRIBUTORS.txt?)
        
        2008-06-23 - reinout
        
        - 1.6 rc7 release
        
        2008-06-16 - mr_savage
        
        - skins/task_overview.pt
        changed tal to use urlparameter memberid when constructing links
        to tasks in different states if param present in
        request
        
        2008-06-16 - mr_savage
        
        - skins/booking_details.pt
        changed tal to use urlparameter memberid when constructing links
        to previous / current month if param present in
        request
        
        2008-06-16 - mr_savage
        
        - skins/booking_year.pt
        changed tal to use urlparameter memberid when constructing links
        to previous / next year if param present in
        request
        
        2008-06-16 - mr_savage
        
        - skins/booking_month.pt
        changed tal to use urlparameter memberid when constructing links
        to booking_year, previous-month, current-month if param present in
        request
        
        2008-06-13 - mr_savage
        
        - browser/poi.py get_open_issues_in_project() now internally
        calls a multi adapter ( context, request ) to get issues
        - adapters.py
        default implementation of IXMIssueGetter
        - interfaces/xmissuegetter.py IXMIssueGetter interface
        - configure.zcml
        adapter registration
        
        2008-06-10 - mr_savage
        
        - content/iteration.py set the default for the startDate to current
        DateTime
        
        2008-06-06 - maurits
        
        - Split single kss event handler on the IAfterTransitionEvent into a
        story and task specific one.
        
        - Used xm.AddTask in a few spots.
        
        - Added permissions.zcml for defining permissions like xm.AddProject.
        
        - Register event handler to update some viewlets on the story page
        when that story gets a workflow transition.
        
        
        2008-06-06 - maurits + jladage
        
        - Added getLayout method to Project.py.  This exists to please the
        discussion form.  Needed because we do not mix in the
        DynamicViewFTI class.  Note: this is also used by e.g. Stories by
        using acquisition.
        
        
        2008-06-05 - maurits
        
        - Do not load the details for all stories in the project or
        iteration view.  Instead use KSS to show those details when
        wanted.  eXtreme.js is no longer needed, but can't be properly
        removed from the javascript registry with GenericSetup.
        
        - Fixed own mistake in generateUniqueId where this would fail if
        there were no tasks in the story yet.
        
        2008-05-20 - maurits
        
        - Remove empty interfaces/IXMCustomer.py and accompanying Zope 3
        bridge.
        
        - Lots of pep8/pyflakes cleanup.
        
        - Remove the unused migration functions from setuphandlers.py.
        
        2008-05-15 - maurits
        
        - In install.py do not notify the quick installer that we have
        installed our own GS profile; meanwhile there were three
        references to eXtremeManagement, Products.eXtremeManagement and
        profile-Products.eXtremeManagement in the quick installer in a
        test site.
        
        - Removed the upgrade profile for moving to 3.0 (that was removing a
        few actions from content types) as it was confusing for developers
        and now also for the quick installer.
        
        2008-05-14 - maurits
        
        - Do not send task emails when updating the task schema, also when
        not using the (commented out) method in setuphandlers.py.
        
        - Fixed some bugs around bookings, mostly the detailed bookings view,
        including fixing some test failures.
        
        2008-03-30 - jladage
        
        - Added 'billableProject' field to the Project content type. A booking
        will set the default value according to the projects value.
        
        - Extended the month_booking view with percentage of billable work, excluded
        double entries from previous months in total hours and greyed out those
        cells. If the employee booked less than 8 hours a day it's marked red.
        
        2008-02-25 - jladage
        
        - Refactored the QuickInstaller code to use Install.py again to make sure
        our dependencies are installed correctly. Also move the GS profiles
        of xm.booking and xm.portlets to this profile.
        
        2008-02-25 - mark
        
        - Change in the iteration workflow so the sharing tab is not shown
        for iterations and all content contained in them.
        
        2008-02-14 - mark and maurits
        
        - Replaced the macros in the iteration and story views by providers.
        
        2008-01-28 - mark
        
        - Make the add task KSS form more robust to also cope with a lack of
        assignees.
        
        - While we're at it: also add portal messages to provide feedback to
        the user when the task is added and when there is no title.
        
        2008-01-21 - mark
        
        - The offer view has its own browser view class now.
        
        - In the offer view a story can be edited by a single click on the
        pencil icon. (That is, is the user has the "Modify portal content"
        permission on the stories.)
        
        2008-01-20 - jladage
        
        - Up till now Customers had 'Delete object' and 'Copy and Move' permission
        with a project. Also the new Offer content type was addable by Customer.
        These security issues are now corrected. To update your site security,
        reinstall the product and hit the "Update security setting" in the
        portal_workflow.
        
        20080-01-14 - mark
        
        - It is now also possible to directly assign someone to a task when
        using the form at the bottom of the story view.
        
        - Made several strings in page templates i18n aware.
        
        2008-01-14 - jladage
        
        - Renamed non_iterations to attachment, because we filter our both
        iterations and offers. Minor changes to the project view, including
        translations
        
        2008-01-11 - joris and mark
        
        - Additional content type: Offer.
        To bundle all the initial stories when a project starts.
        
        2008-01-02 - maurits
        
        - Bugfix: no bookings were shown for January in the booking month
        overview.
        
        2007-12-21 - joris
        
        - Moved the graph option from the config.py to the xm_properties
        and optimistically renamed it project_chart in anticipation of
        more charts
        
        - Dynamically scale the labels for the y-axis so it shows human
        readable steps like 1, 2, 5, 10, 20, ...
        
        2007-12-12 - joris
        
        - Added charts to xm tool. Because this is the first release of charts
        they are disabled by default in the code. To enable the graphs, set
        GRAPHS to True in the config.py.
        
        - There is now one view with a chart: the Project view has a estimated
        hours and worked hours per iteration chart.
        
        2007-12-11 - mark
        
        - Added a form to the bottom of the story view (using a viewlet) to
        quickly add multiple tasks.
        
        - Added a budget field to the project content type and show the hours left
        on the iteration view (for open iterations).
        
        2007-10-30 - maurits
        
        - Bugfix: DST bug in the week/month bookings overview and possibly
        some more.  It adds a good number of tests for that as well.
        
        2007-06-18 - rocky
        
        - Added UI information to display the reason why a story or task cannot
        be "activated".
        
        - Task details table refactored to float to the right along with the
        new reason-task-cannot-be-activated details.
        
        - Replaced assignee username information being displayed on the task view
        with the "nicest" form of the user (ie full name if it exists, otherwise
        username).
        
        - Replaced booking "booked by" information being displayed on the task view
        with the "nicest" form of the user (ie full name if it exists, otherwise
        username).
        
        2007-05-04 - maurits
        
        * Merge the mergeable parts of branches/1.2-events:
        
        - 38656:40204: small start with event handler, big cleanup of tests,
        add testbrowser tests, use IntDisplayList for Task/Booking
        hours/minutes.
        
        - 40226: only the part of this commit that changes doc/create.txt
        and tests dir: manually fire event.
        
        - 40256: use e.g. tasks.update(hours=5) instead of other ways to
        update fields, which helps in triggering a reindex.
        
        - 40417: add property sheet for eXtremeManagement with GenericSetup,
        containing HOURS_PER_DAY and MAXIMUM_NOT_COMPLETED_PERCENTAGE that
        used to be in AppConfig.py
        
        - 41415:41483: improve the order of the install function and the
        GenericSetup steps, moving functions from that quick installer to
        GS.  Add property send_task_mails to our property sheet, which can
        be set to False when updating the Task schema (which is done
        during install).
        
        2007-05-03 - jladage
        
        - Cleanup up license headers in all files
        
        - Removed unused afterInstall and afterUninstall method
        
        - Updated schema definitions for Customer, CustomerFolder and
        ProjectMember.
        
        - clean up getattrs for __implements__ of all types
        
        - Move AppConfig.py code to config.py
        
        
        
        2006-05-05 - friessnegger
        
        - content/story.py
        getRawEstimate was accessing tasks by calling contentValues()
        we also want to allow other content apart from tasks in
        stories so i refactored the code in story
        to use the new method getStoryTasks that is aware of that.
        
        - skins/getStateSortedContent.py
        set the filter on Story and Task objects, to make a story
        containing other types than tasks beeing displayable.
        since the script is also used in a project to display stories
        i added  story as a type too.
        
        
        2006-04-06 - friessnegger
        
        - tools/xmtool.py:
        added filtering capability to ``getFilteredIssues``
        
        - skins/xm_dashboard.pt
        refactored dashboard using a script rather than the tools-method
        to be able to call it anywhere in the portal and get all issues
        and tasks in the current path.
        dashboard only shows todo issues/tasks ('open', 'in-progress', ...)
        
        2006-03-10 - batlogg, friessnegger
        
        - added support to assign members out of PAS to tasks
        
        - refactored Task._get_assignees, Project.getMembers
        
        
        2005-10-23 - jladage
        
        - Release 1.0
        
        - fixed permission
        
        - fixed workflows
        
        
        
        2005-09-23 - jladage
        
        - Prepared initial release by merging the agx-itegration branch back to trunk.
        
        - Added tests package and related classed to the model.
        
        - Wrote more tests for Setup and Content Types.
        
        - Fixed calculations
        
Platform: UNKNOWN
Classifier: Framework :: Plone
Classifier: Framework :: Zope2
Classifier: Framework :: Zope3
Classifier: Programming Language :: Python
Classifier: Topic :: Software Development :: Libraries :: Python Modules